ONSHORE

We remove what others miss.

The proven core — 30 years on the region’s plants.
The filtration & separation authority for Asia-Pacific oil & gas.
ITSB ARCHIVE — GENUINE PENTAIR ELEMENTS & VESSEL INTERNALS
30 yearsseparation engineering since 1993
PETRONAS-group recordthree decades of delivered work
Design → Commissioningthe whole system, in-house
Genuine Pentairvalidated media, backed in-region
GENUINE PENTAIR TECHNOLOGYPentair
Where the money leaks onshore

The duties we engineer for

Inlet / fuel gas

Liquid carryover at the inlet — downtime, fouling, damaged burners and blades.

Amine / glycol systems

Foaming, chemical loss and derate — root-cause filtration, not antifoam band-aids.

Produced / sour water

Meet discharge limits; recover hydrocarbon as sellable product.

Compressor / turbine protection

Remove the penetrating aerosols conventional coalescers and demister pads miss.

The work

Built here, proven here

Skid-mounted process packages

Complete filtration and conditioning skids — vessels, piping, E&I — functionally tested before shipping.
Design · fabrication · FAT

Plant installations

Separation and filtration systems installed and commissioned on the region’s gas, refining and petrochemical plants.
Installation · commissioning

Gas infrastructure & metering heritage

Designer of PGB city-gate stations since 1993; ITSB dry gas filters across the PGB meter-station network.
Gas filtration · metering

Vessel & manifold fabrication

Pressure vessels and packages fabricated to international codes at our own yard.
Fabrication · codes

PETRONAS Gas TULIP Project

Launcher and receiver equipment for the PETRONAS Gas TULIP Project.
Pipeline facilities · launcher / receiver

Elements & vessel internals

Genuine Pentair separation elements and engineered vessel internals — element supply and vessel upgrades across the region’s plants.
Element supply · vessel upgrades
Where the story began

Metering built the trust. Separation is what we lead with.

ITSB was the designer for PGB city-gate metering stations in 1993 and built the installed base that followed. Thirty years later that infrastructure is still running — including ITSB dry gas filters across the PGB meter-station network.

Heritage as supporting depth — the headline business is engineered separation.

Gas metering pipework and station infrastructure at Nilai City Gate Station, Negeri Sembilan.

Tell us the stream. We’ll tell you what others are missing.